Use Master Schedule - By Period to evaluate the result of the level 1 calculation, using a period template.
Note: Periods on the period template depend on the work time calendar based on which the period template was generated. Therefore to view all data, a period template based on a calendar which has seven days for its schedule has to be used.
This activity requires that the level 1 calculation of the selected part must have been performed.