Evaluate Master Scheduling Level 1 Result Using Table

Explanation

Use page Master Schedule by Part tab Master Schedule Grid to evaluate the result of the master scheduling level 1 calculation.

Prerequisites

This activity requires that the calculation of master scheduling level 1 must have been performed.

System Effects

N/A