Use this activity to study a bar graph of the workload for a specific work center during a specified interval of time. You also can study the workload for different master schedule sets, since these can have different forecasts. In this way, you can see how different forecasts burden the work centers. You can also see the effect of changing capacity by using different capacity scenarios.
The workload shown in the graph is divided per master schedule set.
This activity requires that the calculation of RRP must have been performed.
There are no system effects as a result of performing this activity.