Use this activity to import a user-specified set of planned demands from customer schedules for a Level 1 part (for one or all customers), that were generated in IFS/Customer Schedule. The system imports all of the planned demand that have been generated for the designated Level 1 part during the specified time span. Depending on your preference, this time span may or may not fall within the limits of the Planning Time Fence (PTF). To monitor the status of the import activity, check the Action Messages tab of Master Schedule by Part.
This activity requires the existence of a Level 1 Part that has an associated set of plan demands in IFS/Customer Scheduling.
As a result of this activity, the system imports a set of customer plan demands from IFS/Customer Scheduling for the specified Level 1 Part.