Connect Isolation ID

Explanation

Use this activity to connect an isolation to a permit linked to a PM Action. You can only connect isolations to a permit of isolation permit type.

Prerequisites

Before the information is entered, the following must have been completed:

System Effects

As a result of this activity, an isolation is connected to a permit on a PM Action. All future work orders generated from this PM Action will inherit the isolation required during the performance of  the work.