Replace Obsolete Work Task Template Revisions
Explanation
This activity is used to replace obsolete work task template revisions that
are connected to PM actions. You can replace the revisions for a
work task template from the Work Task Template page if you
navigate to Handle Obsolete Revisions and click Replace
Obsolete Revisions on PM Actions. Under Handle Obsolete Revisions
it is possible to view a summary of the registered PM actions and work orders
that have connections to obsolete work task templates.
You can replace obsolete revisions in batches with the Replace Obsolete Work Task Templates on PM Actions
assistant, this option can also be scheduled to be performed automatically during
a time period.
Prerequisites
- A connection between the obsolete work task template
revision and the PM action must exist.
- An active revision of the obsolete work task template revision
must exist in the system.
- The connected PM action must be in the Preliminary
or Active status.
System Effects
- If the obsolete work task template revision is connected to a PM action in Preliminary status, this PM Action will be updated with the active
work task template revision
- If the obsolete work task template revision is connected to a PM action in Active status, a new revision of the PM Action will be created with the active
work task template revision. This is done automatically unless there are exceptions, e.g., the revision number of the PM action is a non-numeric value or preliminary PM Action exist. For such PM actions you need to manually create a new revision of the PM action and make the connection to the active
work task template. The background job for replacing obsolete work task template revisions will be updated with information on the exceptions that need to be handled manually.