Integrate into Visit Structure

Explanation

This activity is used to integrate work into a visit structure, for instance, faults that are not already reported to the maintenance organization can exist in a technical log and may need to be corrected during the maintenance visit. These faults can be reported in the system and included to an ongoing maintenance order.

Click the Assign Events option from the Manage Maintenance Order page to assign an event to the selected maintenance order using Assign Maintenance Event assistant.

Prerequisites

System Effects