Use this activity to create shipment plans. A shipment plan can be created in two different ways:
Item should have been defined with an inventory part and gross requirements should have been calculated to get the correct quantities and dates. The automatic creation of shipment plans requires a top phantom item to be created. The phantom item's component structure, must have been defined with inventory parts.
The same material can be added on several work task plans and shipment plans as longs as the total required quantity isn't exceeded. The total required quantity is calculated when gross requirement calculation is run. The quantity for the same material can be balanced between shipment plans and work task plans, so that it doesn't exceed the total required quantity: