Use this activity to create a project deliverables structure by using an item configuration. A deliverable structure can be created from an item configuration in three different ways:
All three ways of creating a project deliverable structure are described in below procedures.
Part with configuration structure and a configure to order setup (CTO setup) must have been created and added as a part on project deliverable item. The label Configurable on project deliverable item indicates that the selected part has a configuration.
A project deliverable structure is created and defined with part information.
Operations will be copied from configuration structure to project deliverable structure.