This activity is used to disqualify a data point to continue in a skip lot process. A product can be disqualified from skip lot state Skip Lot Inspection due to one or more reasons. It can be due to no production activity during a period agreed by both the supplier and the responsible authority or when the responsible authority wishes to resume skip lot state Lot by Lot Inspection.
To disqualify skip lot sampling for a data point, click Disqualify Skip Lot Sampling on the Control Plan Lines tab and confirm.
Product will be automatically disqualified from skip lot state Skip Lot Inspection if the requalification is not achieved. Reasons for not achieving the requalification can be a lot is not accepted during skip lot state skip lot inspection, a lot is accepted but the qualification score is reset to Zero or 4 to 6 lots have been accepted on original inspection.
As a result of this activity: