This activity is used to determine whether a control plan for manufacturing or a control plan for purchasing is required for a specific part at all sites, for all parts at a specific site, or for a specific part at a specific site.
A control plan can be made mandatory from different pages:
If a control plan for manufacturing is required for a specific part, site
or part per site, enable Mandatory Shop Order Control Plan
for that specific part, site or part per site. Similarly, if a control plan
for purchasing is required enable Mandatory Purchasing Control Plan.
This activity has the following prerequisites:
As a result of this activity, a control plan in the Active status will be required for a specific part at all sites, for all part at a specific site, or for a specific part at a specific site, when releasing the shop order or receiving the purchase order.
When making a control plan mandatory, the following order of priority is considered.