Add/ Modify Material Lines

Explanation

This activity is used to add or modify the Material lines in the Work Task Service.

There are three types of parts that have been introduced to the material line,

  1. Inventory Part

  2. Non-Inventory Part

  3. No-Part

Modification of the material line can be done when there’s a change in the quantity of the material required, a change in the required date or a change in the method of supplying the required material.

The material line can also be modified based on the location to which the material needs to be delivered. Modifying or adding a material line to enable the Direct to Service Location flow via Shipment order and Purchase Order will be as follows.

The material line can also be modified based on the material that needs to be picked up from a Supplier or a Warehouse. The Material to be purchased from a supplier can be picked up from the supplier’s location, while material via a shipment can be obtained from the site’s warehouse.

Prerequisites

System Effects

As a result of this activity,

The system is restricted the branch logistic sites of the Service Organization for the part site, and The system will allow only the Main Logistic Site for the Part Site when the Delivery Method is the Pickup. Also, the system gives an error message if selects the branch site of the Service Organization.

When adding No-Parts for the material lines, the system will fetch the Main Logistic Site of the Service Organization for the Part Site.