Remove Resource Schedules and Capacity

Explanation

Perform this activity to remove existing resource schedules, capacity and shift deviations for a period.

This can, for example, be useful if generated schedules and capacity records are no longer valid for the resource or if schedules and capacity have been generated over an extended period for tactical planning and capacity analysis. Define a specific period for the records to be removed or define the From Date and leave the To Date blank to remove all records from the From Date and forward.

The Remove Resource Schedule and Capacity dialog can be accessed through the navigator.

Prerequisites

Resource schedules and capacity records must have been generated.

System Effects

Resource schedules, capacity and shift deviations will be removed for the defined time period.

Resource shift change logs are created If a shift freeze period has been defined and the shifts are changed within that freeze period. The change log can be viewed in the Resource Shift Change Log page and the shift freeze period is defined in Resource Basic Data.