Use Master Schedule Grid in Master Schedule – Online Consumption page to
analyze the result of the master scheduling level 1 calculation when MS
level 1 part is using Online Consumption.
There are two types of promise
methods. The promised method can be either Available to Promise or
Unconsumed Forecast. Columns in Master Schedule Grid will be changed
according to the Promise method.
This page is not available for Project
Master Scheduling.
To perform this activity, you must have an active master schedule level 1
part with MS Set 1.
Enter Customer Order line or Sales Quotation line for
that master schedule level 1 part.
N/A