Perform Due Calculation

Explanation

This activity is used to start one or several due calculations for a specific serial. The valid options to run are:

The due calculations can be run for the entire serial structure or just for the serial itself. There is also an option to run the calculations as a background job and this is recommended if the calculations are to be run for the entire structure.

You can perform this activity for a selected serial by opening the Serial Maintenance page and selecting Perform Due Calculation option.

Note: When the due calculations are finished, you can view the calculated due dates and values for all types in the Serial Maintenance page besides for the fault deferrals. Fault deferrals can be viewed in the General tab in Manage Fault Informtion page.

Prerequisites

System Effects