Set Serial Structure Out Of Operation

Explanation

This activity is used to set the operational status for the selected serial and all serials below it in the structure to Out Of Operation. You can use this activity during the following instances:

When the structure is In Operation the operational condition of all serials in the structure will be Operational. Once the operational status of the structure is changed from In Operation to Out Of Operation, you can change the operational condition of all serials in the structure to Non Operational.

When building a new serial structure, the operational status is initially set to Planned For Operation and the operational condition to Non Operational. If the serials are not new (but new within the system), the serial's history data must be entered in the Serial Initialization page. To do this, the serials must be in the Out Of Operation status. When the serials are set to Out Of Operation, default values are created for the operational log and interval maintenance. The serials are assigned to modifications if the serials are within a defined serial range or if the serials have a part number which is assigned to the modification.

If the operational status is changed from Planned For Operation to Out Of Operation while the Set Structure Operational option is enabled, the structure is verified and validations are performed (these are the same validations that are performed when a structure is set to In Operation). Once the operational condition of the serials is set to Operational, the structure is complete. You are highly recommended to verify the new total operational values and other information entered in the Serial Initialization page.

You can perform this activity using the Manage Serial Structure page or the Serial Initialization page.

Prerequisites

System Effects