This activity is used to specify the loading criteria for a supplier payment proposal.
In order to perform this activity, unpaid supplier ledger items that match the loading criteria specified must exist. If the Project is considered as one of the loading criteria, ledger items posted to the project code part must exist.
As a result of this entry, ledger items covered by the payment proposal are selected for payment.