Define Scheduling Resource Region

Explanation

This activity is used to connect a Resource to a Location Region. This allows to connect resource to one or more regions and these resources must be registered as scheduling resources. The regions are defined in the Location Basic Data/Location Region.

The incentive for a resource to work in a region can be set from the "Within Region Multiplier" value on a region-by-region basis. Leaving the within region multiplier empty results in the default value 1 being used , which has no effect for the region multiplier. The value "2" multiplies the incentive for the resource to work in the region with "2". The value "0" means that the Scheduling Engine will not schedule work for the resource in the particular region.

Prerequisites

System Effects

As a result of this activity, the scheduling resources of a company that are to be scheduled will be connected to regions with a region multiplier value and can be used when Scheduling.