Report Non Routine

Explanation

This activity is used to report any non routine work that was discovered during a maintenance visit. A non routine is a fault that is discovered during the repair phase of a scheduled maintenance, which needs to be corrected in the ongoing work scope. In order to repair a non routine fault, it must be reported on the work order or work task on which it was discovered. Once the fault is reported a fault event will be created automatically for it and added to the work package (maintenance order) for the ongoing work scope.

A non routine can be reported from the Execute Work Task page and the Execute Work Order page for work orders/tasks with the VIM connection type. Choose one of the following options when reporting a non routine:

Scheduled maintenance covered by heavy maintenance contracts

If the originating maintenance event is connected to a heavy maintenance contract, use the Report Fault option to report the non routine. This is necessary in order to utilize the cap calculation and commercial approval for non routine work.

Note: If the Report Partially Repaired Faults option is used and the defined cap values are exceeded by the task cards connected to the non routine, the non routine event will be released with the Proceed at Risk option enabled.

The cap calculation will be executed the first time the non routine event is set to the Under Preparation status. If the planned resource and material demands for the non routine exceed the cap values defined on the connected heavy maintenance contract, the MRO provider will require commercial approval to proceed with the non routine work.

The non routine will be created in the Under Preparation status with the Commercial Approval Required option enabled, if the non routine was reported using the Report Fault option and the resource and material demands of the predefined task cards exceed the cap values of the connected heavy maintenance contract. If the defined cap values are not exceeded by the resource and material demands of the predefined task cards, the non routine event will be released.

For more information on how to report faults, refer the Report a Fault activity.

Prerequisites

System Effects

Non Routines reported for scheduled maintenance covered by heavy maintenance contracts: