Calculate Lead Time for Routing

Explanation

This activity is used to calculate the lead time of a routing alternate.

The calculation is initiated from the Calculate Lead Time dialog. To access the dialog, click Calculate Lead Time either from the Alternate section on the Routing page, from the Routing Alternate page or from the Routing Alternates page. In the dialog, specify the settings to use. If you want to compare the calculated values for the Calculation Lot Size, that is equal to the Std Lot Size of the part, with the values calculated for another simulation lot size you can enter that simulation lot size in the Simulation Lot Size field. Then click OK to run the calculation. For additional information see Routing Lead Time Calculation.

Prerequisites

A part with a defined routing alternate must exist.

System Effects