Set Historical Stress Rating

Explanation

This activity is used to specify the stress ratings for a serial structure at a given date. If no recorded date is given, the system date is used to report operational loggings on life limited parts, the stress ratings must exist at the given measure date. Record all historical stress ratings before performing operational loggings.

For more information on the life limit concept, refer the online help file Life Limits Concept in IFS Fleet and Asset Management.

Prerequisites

Stress ratings must have been defined for the template part. For more information, refer to the activity Define Stress Ratings.

System Effects

All the stress ratings entered for the serial are entered into the history. The serial's stress rating history is used to calculate the remaining life for life limited parts. Note that setting historical stress ratings will not affect the stress ratings of already reported operational loggings.