Cancel Work Task

Explanation

This activity is used to cancel a work task. When cancelling the work task, a cancellation cause must be given. There are several conditions that must be met to be able to cancel the work task. These are described under Prerequisites.

The maximum number of work tasks that can be canceled at the same time is depending on the Task Sequence Number (Task Number) length. If the maximum number is exceeded, a controlled Error Toast Message will show, informing you to select less Work Tasks.

Prerequisites

Before cancelling the work task, the following conditions must be met:

System Effects

As a result of this activity, the work task will be set to the Cancelled status and no further work can be planned or executed on the work task.