Set Change Source Revision to Ready for Analysis
Explanation
To indicate to an engineering service partner that an IPC Revision is ready to be worked on, and to extract
suggested changes, the status of the IPC Document Revision must be set to Ready for Analysis.
Prerequisites
- An IPC Document Revision must be uploaded.
- The baseline should be generated.
System Effects
- An email is sent to the engineering service partner indicating that the IPC revision is ready to be
analyzed.