Use this activity to study the resources assigned to each operation by Manufacturing Scheduling Optimization (MSO).
The shop order infinite scheduler assigns a resource, but it does not consider finite/infinite resources when scheduling. MSO will book finite resources without overloading them and thereby creating a finite schedule for operations. These resource assignments can be investigated using this page.
Operations should have been scheduled by the MSO scheduling service.
N/A