Connect Hazards to Risk Assessment
Explanation
This activity is used to specify the hazards that should be evaluated during the risk assessment. Possible
hazards affecting personnel and/or property in the organization are predefined. These hazards are thereby assessed
or evaluated during the risk assessment.
Once the Hazard is defined in the Risk Assessment to calculate the risk potential for each hazard;
- In the Probability field, select the description of the risk likelihood from the list. The
corresponding probability value shows in the Probability Value.
- In the Frequency field, select the option specifying the frequency of risk occurrence from the value
list. The corresponding frequency value shows in the Frequency Value.
- In the Severity field, select the description for the severity of risk from the list. The
corresponding severity value shows in the Severity Value.
- Save the information. Note that the risk potential is calculated from all values in the risk calculator and
shown in the Risk Potential.
Prerequisites
In order to perform this activity:
- Potential hazards are required to be already defined in the Risk Assessment Basic Data/Hazards.
- Locations and sub-locations are required to be already defined in the Location Basic Data
.
- Descriptions and values of frequency, severity and probability of risk are required to be already defined in
the Risk Potential Basic Data .
System Effects
As a result of this activity, the hazards you create will be updated on the Hazards navigator.