Specify Step Type Prepare Distribution
Explanation
This activity is used to include a step of the Prepare Distribution step type in a selected cost
allocation procedure. Both amount and quantity balances stored in ledgers and budgets can be used as the basis for
distribution calculations, regardless of the allocation type of the procedure.
Prerequisites
In order to perform this activity:
- A cost allocation procedure of the Defined or Active status should exist.
- A distribution of the Automatic type should be connected to the cost allocation procedure.
System Effects
As a result of this activity, the following system effects will take place once the step is executed.
- The status of the selected distribution of Automatic type will change to Prepared.
- The cost amounts to be distributed to each code string combination will be calculated based on the selected
distribution.