Model: Project - Specifications for Fact Table: PROJECT FORECAST ITEM PERIOD PFP

On this page you will find the specifications regarding the Model: Project and Fact Table: PROJECT FORECAST ITEM PERIOD PFP.

This model fact represents project forecast item period information and is based on the IFS Cloud fact FACT_PROJ_FRC_ITEM_PER

Note: Please refer to documentation of each model to find out about attributes used in referenced models.

Attributes

Attribute Description (where applicable)
Company Code Company
Line Description Line Description
Line Status Line Status
Financially Responsible Code Line Financially Responsible
Financially Responsible Line Financially Responsible Code
Confirmed By Represents the responsible user for the confirmation
Cost Struct Item Type Cost Structure Item Type
Accounting Period Key Accounting Period
Forecast Id Key Forecast Id, part of PK in original source
Item No Key Item No, part of PK in original source
Accounting Year Key Accounting Year

Measures (table to be generated as far as possible)

Aggregation of measures is based on SUM if not explicitly noted.

This section describes the basic measures in the cube. These are either measures defined in the core Information Source, in the model itself or in the ETL process. The columns have the following meaning:

Measure Calculated Y/N Contains Time Intelligence Y/N Definition/Note (where applicable) Aggregation Type Hidden Y/N Measure Expression
Connected Cost Budget Curr PFP N N Budget Currency calculation N SUM([CONNECTED_BUDGET])
Connected Rev Budget Curr PFP N N Budget Currency calculation N SUM([CONNECTED_BUDGET_REV])
Cost Budget Curr PFP N N Budget Currency calculation N SUM([AMOUNT_BUDGET])
Rev Budget Curr PFP N N Budget Currency calculation N SUM([AMOUNT_BUDGET_REV])
Connected Cost Proj Curr PFP N N Project Currency calculation N SUM([CONNECTED_PROJECT])
Connected Rev Proj Curr PFP N N Project Currency calculation N SUM([CONNECTED_PROJECT_REV])
Cost Proj Curr PFP N N Project Currency calculation N SUM([AMOUNT_PROJECT])
Rev Proj Curr PFP N N Project Currency calculation N SUM([AMOUNT_PROJECT_REV])
Connected Cost RC PFP Y Y Reporting Currency calculation N SUM([REP_CURR_CONNECTED])/[Currency Rate]
Connected Rev RC PFP Y Y Reporting Currency calculation N SUM([REP_CURR_CONNECTED_REV])/[Currency Rate]
Cost RC PFP Y Y Reporting Currency calculation N SUM([REP_CURR_AMOUNT])/[Currency Rate]
Rev RC PFP N Y Reporting Currency calculation N SUM([REP_CURR_AMOUNT_REV])/[Currency Rate]
Connected Cost Trans Curr PFP N N N SUM([CONNECTED_TRANSACTION])
Connected Rev Trans Curr PFP N N N SUM([CONNECTED_TRANSACTION_REV])
Cost Trans Curr PFP N N N SUM([AMOUNT_TRANSACTION])
Rev Trans Curr PFP N N N SUM([AMOUNT_TRANSACTION_REV])
Connected Cost PFP N N N SUM([CONNECTED])
Connected Rev PFP N N N SUM([CONNECTED_REV])
Cost PFP N N N SUM([AMOUNT])
Rev PFP Y N N SUM([AMOUNT_REV])

Time Intelligence Measures

Time based measures are calculated in the cube with respect to other measures. The table below defines the meaning/definition of  the different time measures. These measures need to be used with a specific time dimension hierarchy [REPORTING_DATE].[RepDateMFHy].

Measure Meaning
YTD Aggregated value for current month in current  year. E.g. for period 202010 Ytd represents sum of periods 202000-202010.
R12 For a given period, the sum all months from one year back up to the previous month. E.g. Rolling 12 for 202010 is the sum of months 201910 - 202009
PY Previous Year
The value of the corresponding month one year back. E.g. for month 202010, the value of month 201910.
YTD PY Year to Date Previous Year
Aggregated value for corresponding month one year back. E.g. for month 202010 YTD Previous Year represents sum of months 201901-201910.
R12 PY Rolling 12 (completed) Months Previous Year
For a given month, first going one year back, then taking the sum of all months from one (more) year back up to the previous month. E.g. for month 202010 the sum of month 201810-201909
Avg XXX Ytd Sum XXX YTD/Count XXX YTD
Avg XXX R12 Sum XXX R12/Count XXX R12
XXX % YTD Count XXX YTD/Count YYY YTD
XXX % R12 Count XXX R12/Count XXX R12

USED BY MODEL(S)

Model Name

Data source Information

The data source for this object is defined using IFS Developer Tool. Further Transformations are done using Power BI.

Additional information can be found in the online documentation of Information Sources.

Model Table BI Access View Referenced Information Source Recommended Access Type
PROJECT FORECAST ITEM PERIOD PFP FACT_PROJ_FRC_ITEM_PER_PQ_BI FACT_PROJ_FRC_ITEM_PER_PQ On Line