Verify Application Messages Statuses
Explanation
Use this activity to verify the proper execution of application messages created during the enabling of the IFS
PSO (Planning Scheduling and Optimization) server.
Prerequisites
- MSO solution uses IFS Planning Scheduling and Optimization (PSO) solution as its scheduling engine.
Therefore, it is mandatory to have an online PSO scheduling server running to execute this activity.
- Finite Scheduling Basic Data must be defined for the Site.
- The Site should be enabled to use MSO.
- For Simulation, Simulation Scenario should be created and activated to use.
System Effects
- If application messages jobs are in their expected final status, then it is one of the many prerequisites for
the correct set up of MSO enabled Site.
- If application messages jobs are not in their expected final status, actions should be taken, to get them to
the expected final status.