Issue
Explanation
This activity is used to issue the topmost material item/s of the deliverables structure. User need to mark an
issuable item using the Consumption Item toggle. Only the topmost material item, which doesn't
have a shipment plan or work task plan attached, can be marked as a Consumption Item. Material status will not be
considered for the standard planned items.
Prerequisites
- Item status must be Approved.
- Material must be Fully Received or Partially Received.
- Item must be marked as consumption item.
System Effects
- Consumption plan will be created when issuing an item for the first time.
- Item cannot be marked as a non-consumption item once the consumption plan is created for an item (Consumption
Item toggle will be non editable at this point).
- Project connection will be created for the consumption plan, and this is how used cost will be reported if
the supply option of the item is MRP.
- Unissue command will be available for the partially or fully issued items.