Set Up Basic Data to Enable Overhead to Project Labor Time
Explanation
In order to have an overhead cost added to the project time transaction postings, you need to set-up the
following:
- Posting control for posting types PRJT1, PRJT2, PRJT3, and PRJT4 must have been defined.
- Cost details must have been entered in the Cost Details Basic Data window.
In the Cost Details Basic Data window you need to do the following:
- Select the preferred cost source indicator.
- Enter the cost source ID's that should be used, and their overhead rate.
- Connect the cost source ID to the corresponding cost source indicator.