This activity is used to view and define the availability of a work task. The availability for a work task can
be inherited from the equipment object on the the work task. If no availability has been defined for the equipment
object then the availability defined on the location which is connected to the work task address will decide when
the work can be scheduled. Location availabilities will however never be visible on the work task itself. A
work task availability can be set manually according the requirement and will override both the availability
defined on the location and on the equipment object.
Once a work task is created for an equipment object, the availability of the object will be fetched to the work
task, based on the work type and the priority defined on the work task. If the availability for the work task is
not defined or not inherited from the connected equipment object, then the availability of the
location connected with the work task address will be used for the work task availability when scheduling the
activities for the work task.
As a result of this activity, availability information is set for the work task.