Use this function to assign one or more cost elements to a selected cost bucket.
Note: It is not possible to connect trigger cost elements (141-Purchase Delivery OH Trigger, 230-Labor OH Trigger,
501- Material OH Trigger, 502- General OH Trigger, 601 Sales OH Trigger and 500-Total Cost) directly in to a cost
bucket.
Only the cost elements with similar cost type can be added in to a cost bucket. So a specific cost bucket will contain only the cost elements belonging to specific cost type.
This activity will connect one or more selected cost elements belonging to a specific cost type to a cost bucket, defining how to divide the different types of costs within the manufacturing process.