Release Documents in a Survey
Explanation
Use this activity to release a document/s contained in a part's document survey. Before the part can be
released, all the documents in the document survey must be released. Document requirements can be viewed by
clicking on the attachments in Engineering Part Revision record.
In the attachments click on the Document Revisions and select the documents you need to release
and change the status to Quick Release to perform the activity.
Prerequisites
- One or more documents must exist in the part's document survey.
- The documents should be Approved.
System Effects
- The document is released and cannot be modified.
- When all documents in the survey are released, the part can be released.
- When the part revision is released the document survey will be set to the Locked status. Refer to the
description on Document Object Connections for more information.