Defer Non-Routines

Explanation

Note: For a deferred fault, which is not re-packaged, you can connect/edit any system or sub-system as the failed system.   However, if a deferred fault is re-packaged, you cannot connect a system or sub-system, which is excluded by the contract line connected to its corrective task. 

Prerequisites

System Effects