This activity is used to stop setup time for an employee or team on an operation, or sequence of operations.
To perform this activity from Shop Floor Workbench, select an operation where the current employee or team is reporting setup time and click Leave Setup. It is also possible to perform this activity in Operation Guide. Then you select an operation in Shop Floor Workbench where the current employee or team is reporting setup time, open Operation Guide and click Leave Setup.
Note: In sites where the Prevent Stop Clocking while Tools are Checked Out setting is enabled, the last labor clocking for an operation can only be stopped or cancelled if all tools checked out to that operation have been checked in.