When a project connected shop order is created through a project miscellaneous demand, a customer order or a
manual connection, the material list is always copied from manufacturing standards. If the shop order is connected
to a project activity, it should be possible to issue material from either project inventory or the standard
inventory. The Redefine Supply Code option for the components will change the supply code between invent
order (where the material will be issued from standard inventory) and project inventory or project (where the
material will be issued from project inventory).
Both project and project inventory supply codes will reserve and issue material from the relevant project inventory
and behave almost the same. The only difference between them is that the project inventory type components are
planned by material planning tools like PMRP, while the project type components are not.
To redefined the supply for for a component, select the material line(s) and click Redefine Supply Code.
When a shop order is created from a project miscellaneous demand with the Shop Order supply option and the miscellaneous demand component method of the project is Manually Planned.
else,