Schedule Scenario
Explanation
Use this activity to simulate the scheduling scenario with MSO.
The scheduling scenario is created and optimized based on:
- Shop order scheduling data such as Need date, Earliest start date, Lot size, scheduling direction and other
constraints defined in routing. But the capacity and availability of the constraints will be considered based on
the added/modified/deleted constraints and/or resources in the scheduling scenario.
- Scheduling scenario settings such as Site scheduling optimization parameters like, setup matrices ,
Scheduling Rules and Scheduling Goals given on Finite Scheduling Basic Data page. It is
possible to Scheduling Quality and Maximum Process Time for the scheduling scenario on Scheduling
Scenario page.
- Project activity dates, and Order structures including DOP and Shop order statuses like Released, Started,
etc...
Prerequisites
- Finite scheduling basic data should be created for the site.
- The site should be connected and the PSO server connected to the site should be running (Check server
availability).
- Scheduling Scenario must be created and activated.
System Effects
As a result of this activity, a finitely scheduled scheduling scenario is created and saved back to the
Database. The order of execution ( schedule start and finish times) will be set. Comparison between finite schedule
and scheduling scenarios can be viewed on the Scheduling Scenario Analysis page.