Connect a Technical Drawing Revision
Explanation
This activity is used to connect a technical drawing revision to an engineering part revision or inventory part
revision. A user can connect a technical drawing revision which is already entered on the Technical
Drawing page, using the list of values selector, if the technical drawing is connected to the
relevant master part.
Technical drawing revision can be connected as following:
- When technical drawing is connected to the master part, then you can connect the technical drawing revisions
on the Engineering Part Revisions and Part Revisions pages
using the list of values selector.
- During the engineering revision transfer process, the part revisions will be created including drawing
revisions, if engineering part revisions have technical drawing revisions connected.
On the Engineering Part Revisions page, it is possible to change the connected
technical drawing revision at any time. On the Part Revision page, it is not possible to
change the technical drawing revision if the part revision record is created by the engineering revision transfer
process. If not, technical drawing revision can be changed at any time.
Prerequisites
- A technical drawing number and drawing revisions must be added on the Technical
Drawing page.
- Technical drawing number must be connected to the master part.
System Effects
As a result of this activity:
- A technical drawing revision is connected to the engineering part revision and/or part revision.
- Engineering transfer process will transfer the technical drawing revision along with engineering revision (if
technical drawing revision is connected to the engineering revision).