Enter Routing Lot Size Minimum Quantity
Explanation
Use this activity to define the alternates, if different alternates should be used depending on the lot size
that has to be produced. Enter the lot size in Min Lot Size Based Qty.
Prerequisites
- The part must be defined.
System Effects
As a result of this activity:
- A routing alternate is defined to be valid for a specific Lot Size (Min Lot Qty).
- The Lot Size Based indicates that the part has lot size based routing.