Transfer New Template Structure to Site
Explanation
This activity is used to initiate a new transfer of a top part revision to a destination site. The transfer
process creates the needed inventory parts, manufacturing part revisions and manufacturing structure data.
Use the Transfer To SIte tab to view all sites you are allowed to access which have
the MRO Enabled option enabled. You can start transferring by selecting the sites and click
Transfer to Manufacturing.
Prerequisites
This activity requires that:
- The serial structure template has been created and transferred to the temporary transfer table, and the
structure must be in Active status.
- The top part has never been transferred to the site. The top part can be transferred to other sites
previously.
- The user has access to the site.
- The site must have the MRO Enabled option enabled.
- A default planner and manufacturing engineer must also be defined for the site in IFS/Manufacturing
Standards.
- A part transfer template of type VIM Template is defined in IFS/Manufacturing Standards.
System Effects
As a result of this activity:
- The system confirms the transfer of a top part revision (and all of its level structures) to a site.
- For the top template part, its components and valid alternates, the transfer process creates the following
records: inventory part records for 'real' and position parts; inventory part revision records for
'real' and position parts; and monolithic MRO disassembly and MRO assembly structures and routings.
Transfer process will also creates disposition type product structures for all the position parts present in the
structure.
- A template transfer history record is created, with a transfer status that indicates when the transfer
occurred and whether the transfer succeeded or failed.
- A template transfer log is created with any errors, warnings, or informational messages created during the
transfer.
- If modifications are defined in IFS/Fleet and Asset Management for parts in the transferred structure, an MRO
modification record is created for each of the modifications and an MRO part modification record is also created
for each affected part.