Renumber Operations
Explanation
This activity is used to change the operation numbering step in a routing alternate or in a routing
template.
Prerequisites
This activity requires several number of operations.
System Effects
As a result of this activity:
- The system modifies the routing operation numbers using the given step value, e.g. the step value between two
operations may be 5. This can be used when the user need to add another operation between two operations and need
to maintain the same step value in all three operations. This activity can be done only in Routing,
Routing Template and Estimate pages.
- If operation numbers are already used in other places such as shop orders, or material lines in product
structures, the user has to modify the operation numbers in those relevant places manually.