Add Work Guideline to DOP Order
Explanation
This activity is used to add work guidelines to a selected DOP component or an operation.
Work guidelines are added to a selected DOP component using the DOP Component Work
Guidelines page. To acces the page clicking Work Guidelines on the
Components tab on the DOP Order page. Work guidelines are added
to a selected DOP operation using the DOP Operation Work Guidelines page. To access the
page clicking Work Guidelines on the Operations tab on the
DOP Order page.
In the DOP Component Work Guidelines or the DOP Operation Work
Guidelines page a work guideline is added by clicking the new command and entering information about
the guideline.
- To use an existing work guideline template select a particular work guideline template in the Guideline
Template field.
- To create a work guideline manually, enter information in the Guideline Description and Guideline
Text fields.
- Select a value in the Guideline Type field. For component work guidelines valid values are
Instruction and Reference. If you choose Reference, you must enter values for the X
Coordinate, Y Coordinate, Z Coordinate and Reference Qty fields. For operation work
guidelines valid values are Instruction and Subtask. If you choose Subtask you can select
Required to Close Operation in the Sign Off Required field to prevent the operation from closing
before the subtask has been signed off. Select Required to Close Shop Order in the Inspection Sign Off
Required field to prevent the shop order from closing before the subtask has been signed off.
- Optionally, enter a reference number in the Reference Number field and select a reference type in the
Reference Type field.
- If there is a need to validate the employee qualification for the subtask, you can enter Emp Qual
Profile. Then the field Sign Off Required must have value Required to Close Operation.
- If there is a need to validate the inspection employee qualification for the subtask, you can enter
Inspect Emp Qual Profile. Then the field Inspection Sign of Required must have value
Required to Close Operation or Required to Close Shop Order.
This can also be done from the DOP Header page when expanding the tree structure in
order to display the DOP order.
Prerequisites
The DOP component must not be in the Closed or Cancelled status.
System Effects
As a result of this activity, the system adds work guidelines to a DOP component or an operation. Please note
that if you add a work guideline to a released DOP it will not automatically replicated to the pegged shop
order.