Integrate into Visit Structure
Explanation
This activity is used to integrate work into a visit structure, for instance, faults that are not already
reported to the maintenance organization can exist in a technical log and may need to be corrected during the
maintenance visit. These faults can be reported in the system and included to an ongoing maintenance order.
Click the Assign Events option from the Manage Maintenance Order page
to assign an event to the selected maintenance order using Assign Maintenance Event
assistant.
Prerequisites
- A maintenance order must exist.
- Faults from the technical log for the serial must have been reported.
System Effects
- The fault event(s) will be distributed to the same workshop as the rest of the order with the same planned
start and finish dates and with the same distribution type.
- The fault event(s) will be added to the maintenance order and distributed to the work order if the
distribution type is either Work Order or Execution Logic Structure.
- If the Execution Logic Structure distribution type is used, the fault event(s) will be added to the
ongoing maintenance order and the connected operations will be mapped into the correct execution logic orders
(ELOs) on the maintenance order. In addition, the operations will be mapped into corresponding ELO work orders in
IFS/Work Order Management.