Activate Control Plan Template
Explanation
This activity is used to activate a control plan template revision. The control plan template must be
Active to be used. A control plan template in state Active cannot be changed.
To activate a control plan template revision click Set Active.
Prerequisites
A control plan template revision in status Created must exist. If a checklist exists, then all checklist
items must be approved.
System Effects
As a result of this activity, the control plan template will be in Active status. If you are
activating a new revision of an already existing template:
- Control plans in state Created referring to the template will be updated with the new revision
- Control plans in state Active referring to the template will be phased out and replaced by a
new revision
- Reference to Existing Active Control Plans will be removed if the new template revision is activated.
- Affected shop order will be updated with new control plans.
- Note: Control plans in a state Active with simplified revision handling enabled which refer
control plan templates will behave in similar way. Changes will not be directly applied to active control plans
plans, instead new revision will be created.