Create Analysis for Shop Order
Explanation
This activity is used to create analyses for main product and produced parts connected to the shop order
operation. The routing operation number determines whether a specific data point will be included in the created
analysis. The routing operation number is defined in the Routing page.
A new analysis connected to the specific shop order is created using the Create Analysis - Shop
Order assistant that can be accessed from several pages.
- Shop Floor Workbench page: In the Dispatch List section, click
Control Plan, then Create Analysis.
- Shop Floor Workbench page: In the Dispatch List section, click Operation Guide.
In the Operation Guide assistant, click Create Analysis.
- Shop Order page: On the Operations tab, click
Shop Order Analysis, then Create.
- Shop Order Operations page: Click Shop Order Analysis, then
Create.
- Shop Order Operations Reporting page: On the Internal
Operations tab, click Shop Order Analysis, then Create.
- Work Center Operations Reporting page: On the Internal
Operations tab, click Shop Order Analysis, then Create.
In this assistant you can decide which analyses to create and you can view the information that will be
transferred to the Analysis Result page when you create the analysis. You can enable
Print Analysis Report if you want to print the analysis result. You can also enable Consider
Scrap if scrap needs to be considered when creating an analysis. When you click OK, the
system creates the selected analyses and gives you the possibility to register analysis results immediately. If you
click Yes, you you will be able to enter the analysis results.
Prerequisites
This activity requires that:
- A control plan must exist for the Shop Order. This can be verified in the Shop Order - Control
Plan page.
- The control plan must be in the Active status.
- The shop order must be in the Released or Started status.
System Effects
As a result of this activity
- The system creates selected analyses for the shop order. The analyses are in Planned
status.
- Only the data points connected to the routing operation number of interest will be included in the created
analysis.
For example,
Data Point |
Routing Operation No |
Work Center No |
1 |
10 |
100 |
2 |
10 |
100 |
3 |
20 |
100 |
4 |
20 |
100 |
5 |
30 |
200 |
6 |
20 |
100 |
If an analysis is created for routing operation 20, then only the data points 3, 4, and 6 will be included in
the created analysis.
If an analysis is created for routing operation 30, then only the data point 5 will be included in the created
analysis.
- The sample size for each data point in the created analysis is calculated.
The resulting sample size for each data point is calculated based on the inspection type, quantity to inspect,
and the operation quantity. If Consider Scrap is enabled when creating analysis, then
operation scrap is considered when calculating the sample size for each included data point.
- If the sample size has been defined as a fixed quantity and if the operation quantity is less than the
inspection quantity, then the resulting sample size will be equal to the lot size.
If the sample size has been defined as a percentage of the operation quantity, the resulting sample size will be
rounded up to the nearest integer.