Define FAI Control Plan Lines

Explanation

A FAI control plan manufacturing consists of two levels: a header and one or more control plan lines. This activity is used to create new control plan lines.

 A FAI control plan line specifies how to inspect a specified part during the execution of a FAI shop order.

Only the data types Variable and Categorical are allowed for FAI control plan lines.

For each control plan line, the sample size will be calculated when an analysis is created. To calculate the sample size, an inspection code must be selected.

To create a new control plan line (data point), click the new command on the Control Plan Lines tab;

Prerequisites

System Effects

As a result of this activity, one or more control plan lines will be created.