Change Sub Contract Currency
Explanation
This activity is used to change the currency on the sub contract. The currency can be changed irrespective of
the status of the sub contract.
Prerequisites
- A sub contract which is not the Frozen state should exist.
System Effects
- The sub contract currency is changed.