Use this activity to run Capacity Requirements Planning (CRP) for a selected Material Planning Scenario other than scenario 1 (the live scenario) using the Perform CRP Simulation assistant. The CRP Simulation evaluates machine operation and labor operation loads using the Shop Order Scheduler logic for supply proposals generated by the MRP and Master Scheduling simulations.
You can perform CRP simulation for one site at a time, or if you leave the Site field blank, the simulation is run across all sites to which you have access.
This job is posted as a background job and can be scheduled for later execution.
MRP or Master Scheduling results must exist for the selected site and scenario.