Calculate Warranty Dates
Explanation
This activity is used to calculate warranty dates for the supplier warranty that is connected to the serial.
Once the start date of the warranty is specified, the system will calculate the warranty end date based on the
given start date, minimum value, maximum value and time unit of the warranty condition. Supplier warranty details
are registered in Supplier Warranty tab in Serial Information page.
Prerequisites
- The serial must have been created.
- A supplier warranty with a valid warranty condition must have been created for the serial. For more
information, refer to the activity Enter
and Maintain Supplier Warranties.
- The minimum and maximum validity period as well as a valid time unit must have been registered on the
supplier warranty. Note that the minimum value is required to calculate the Valid From date and the
maximum value is required to calculate the Valid To date.
System Effects
As a result of this activity, valid warranty dates are registered on the serial.