Connect/Change FAI Checklist

Explanation

This activity is used to manually connect a FAI checklist or to change the connected FAI Checklist to a Manufactuing/Supplier First Article Inspection.

To connect/change FAI checklist, click the lov in checklist field in Manufacturing First Article Inspection/Supplier First Article Inspection page and select the required FAI checklist ID.

This can only be done when the First Article Inspection is in Planned status.

Prerequisites

System Effects

As a result of this activity